+39 02 3657 1662

West Power for wind energy

Last August, West Power conducted a campaign of diagnostic electrical measurements on generators of 12 wind turbines, part of a 24 turbines windfarm, located in central Italy.

In order to prepare for this new task, all West Power engineers have followed specific security courses and have purchased all the necessary equipment to access and evacuate safely from the wind turbines.

Measures, first time performed in Italy on wind turbine generators, were carried out over a period of five days, with the help of the staff dedicated to maintenance of the wind farm, and have been successful for all machines. The measurement session will be completed in 2017 completing all turbines in the windfarm.